LIST OF THE COMPLETED AND ONGOING SURVEYING AND DESIGNING PROJECTS BY GLOBAL ENGINEERS | |||||||||
Sl. No. | Name of the client | Project name | Location of the project | Scope of the project | Length of canal system/ road/ dam in kms | Ayacut/ contour survey in acres | Status | Work started | Completion |
1 | AP government Irrigation and CAD Department | Karlapally project | Warangal dist. AP | Survey and Investigation, estimate, design of the minor irrigation tank. | 3 000 | Completed | Aug-04 | Jan-05 | |
2 | AP government Irrigation and CAD Department | Alguvagu Project | Khammam dist. AP | Survey and Investigation, estimate of the minor irrigation tank. | 2 000 | Completed | Sep-04 | Jan-05 | |
3 | M/s Jaiprakash-Gayatri [JV] | SRSP - FFC | Koratla, Karimnagar district | FFC from Km. 43.000 to Km. 57.000. Taking L.S. and C.S. , preparing LA proposals, DCBM, preparing estimates, fixing stones etc. | 14 | Completed | Nov-04 | Apr-05 | |
4 | M/s Ratna Constructions & Hindustan Engineers Syndicate Joint Venture, Hyderabad | Polavaram Project across Godavari river | West Godavari dist, A.P. | Detail survey and investigation for two connectivities, two regulators and furnishing relevant drawings. | Completed | Mar-05 | Jun-05 | ||
5 | AP R&B Department | R&B road survey | Medak dist. AP | L.S. and C.S. survey of the road for preparing estimates | 4 | Completed | Apr-05 | Jun-05 | |
6 | K. Sudarshan Reddy & M/s K. Venkateshwarlu JV, Warangal A.P. | J. Chokkarao Godavari Lift Irrigation Project. Canal distribution system. [Packages 45 & 46] |
Warangal dist. AP | Detailed survey of more than 500 kilometers of canals system, block leveling for 1.0M contour survey for an ayacut of 1,23,000 acres, and preparation of all drawings, reports, land acquisition proposals, estimates and ayacut maps etc. to be submitted to the government. | 600 | 1 23 000 | Completed | Apr-05 | Apr-08 |
7 | M/s Ramky Infrastructure & V. Satyamurty JV, Warangal, A.P. | Sreeramasagar Project - Stage2 canal system | Nalgonda dist A.P. | Detailed Investigation and surveys of distributaries of 36L of DBM71 of Kakatiya Main Canal, [ 50 kilometers of canals, preparation of all drawings, reports, LP Schedules, estimates and ayacut maps, surveys for Field channels etc. | 80 | 38 000 | Completed | May-05 | Jun-06 |
8 | AP government Irrigation and CAD Department | Dharmasagar project under the Devadula Project. | Warangal dist. AP | Survey and Investigation of medium irrigation tank for restoration. | 30 | Completed | Oct-05 | Jan-05 | |
9 | M/s Coastal Projects & AKR JV, Hyderabad | Nettempadu Lift Irrigation Project, Canal distribution system |
Mahbubnagar dist. A.P. | Conducting survey, detailed investigation of left and right main canals system of about 200 km under Gudemdoddi Balancing reservoir for irrigating an ayacut of about 27,000 acres ID Kharif including distributary network system and 1.0m contour survey for an area of about 40,000 acres. | 150 | 27 000 | Stopped | Dec-05 | Oct-06 |
10 | AP Industrial Infrastructure Corporation, Warangal | Industries survey | Khammam dist. AP | Land survey of the land for their development located in Khammam district. The survey was meant to generate contours of 1.0m interval and obtaining all the topographical details in the land and determination of the boundary of the land and preparing relevant drawings. | Completed | Jan-06 | Mar-06 | ||
11 | Subhash Projects & Marketing Limited, Kothagudem, Karimnagar District. | Yellampally Barrage Project across Godavari River | Karimangar dist A.P. | Preparing Land Procurement schedules and village-wise maps for the proposed alignment for laying pipeline from the Yellampally barrage to the NTPC, Kothagudem | Completed | Feb-06 | Mar-06 | ||
12 | M/s Sushee Hitech Pvt. Ltd. Hyderabad | Mid Manair Reservoir | Karimangar dist A.P. | Detailed survey to compute capacity [27 TMC] of the Reservoir, and demarcation of FRL contour [92 kilometers] and survey for the alignment of the proposed dam, site survey for the gated-operational spillway and preparing drawings, Land Procurement Schedules etc. and contour survey to compute capacity of the reservoir for an area of 20,000 acres. | 10 | 20 000 | Completed | Mar-06 | Sep-06 |
13 | Rithwik Projects Limited, Hyderabad | Mylawaram Reservoir South Canal | Kadapa dist., A.P. | Detailed survey of the existing canal system of 25,000 acres under the Mylawaram reservoir, for its modernization. This work comprises taking cross-sections and longitudinal sections of the existing canals, designingof HPs of the canals, proposing lining to the canals and preparing estimates etc. | 190 | 25 000 | Completed | Apr-06 | Nov-07 |
14 | [A score of big construction companies] | DGPS Projects | A.P., Tamilnadu, Karnataka, Bihar, Himachal Pradesh, Goa | Establishing network of control points with DGPS operated by a highly experienced team of operators and technicians along oil pipelines alignments, four-laning of national highways in Andhra Pradesh, Karnataka and Tamil Nadu, skiing projects in Manali, Resorts in Goa etc. | Jun-06 | ||||
15 | M/s Sushee Hitech Pvt. Ltd., Hyderabad | Srisailam Right Branch Canal [Package 25) |
Kurnool dist. A.P. | Survey and Investigation of SRBC from km 0.000 to km 25.067 for the proposed widening from the present 6.10m to 40.0m of bed width including site surveys, submission of HPs, LP schedules etc. | 25 | Completed | Nov-06 | Mar-07 | |
16 | M/s Coastal Projects Pvt. Ltd., Hyderabad | HNSS Proejct [Packages 6,10,15 & 20] |
Anantapur dist., A.P. | Survey, Investigation, designs of the proposed 4 tunnels under packages 6, 10, 15 and 20 of the HNSS main canal. [total length of tunnels = 14 kms] | 15 | Completed | Jan-07 | Mar-07 | |
17 | Ratna Constructions, Hyderabad | Flood Flow Canal, G.N.S.S. Proejct | Kurnool dist. A.P. | Survey, investigation, preparation of HPs of the proposed Flood Flow Canal from km 46.000 to km 57.700 of the Srisailam and submission of proposals to the CE, CDO, Hyderabad for approval and LP Schedules. [ Package 29 ] | 12 | Completed | Mar-07 | Aug-07 | |
18 | PJR Constructions | Rajiv Sagar Project [Dummugudem Project] Package 68/2 |
Khammam dist. AP | Conducting survey of the proposed approach canals fromt the Godavari river and link canals upto Karakavagu including fixing alignments of the canals, preparing LP Schedules, conducting site survey for the structures etc and submitting propossals to the govt. for approval. | 45 | Completed | May-07 | Apr-08 | |
19 | M/s V. Satyamurty Company | J. Chokkarao Godavari Lift Irrigation Project. Canal distribution system. |
Warangal dist. AP | Survey, Investigation for the Proposed Right Main Canal and its distributaries system including block leveling for 1.0m contours of an area of 65,000 acres, preparation of ayacut maps, registers, site surveys, LP Schedules etc. pertaining to Ghanpur Reservoir for an ayacut of 40,000 acres | 150 | 40 000 | Completed | Sep-07 | Jun-08 |
20 | Ratna Constructions, Hyderabad | Rajiv Sagar Project [Dummugudem Project] | Khammam dist. AP | Survey, investigation, preparation of L.S. and Survey Plans, preparation of LP Schedules, fixing of BM and boundary stones etc, submission of the proposals for the proposed pressure mains for approval to the CE, CDO, Hyderabad under Package 33. The length of the pipeline is around 35 kilometers in two rows of pipes. | 33 | Completed | Sep-07 | Mar-08 | |
21 | M/s Coastal Projects Limited | Flood Banks along Godavari River Packages 70.71,72,73 |
Khammam dist. AP | Conducting survey to construct flood banks along the banks of the Godavari river near Bhadrachalam town and other villages in the vicinity, the work includes conducting contour survey to finalize alignment of the flood banks for about 70 kms , preparing LP Schedules, preparing estimates etc for taking approval from the government. | 70 | Completed | Nov-07 | Mar-08 | |
22 | M/s Ratna -MEIL JV, Hyderabad |
Gandipally Reservoir | Husnabad, Karimnagar dist. | Conducting detail survey and investigation of the proposed reservoir at Gandipally village near Husnabad, Karimnagar district including survey of left and right main canals, distribution system of canals and block leveling for an ayacut of 14,000 acres. | 120 | 14 000 | Discontinued | Jan-08 | Dec-08 |
23 | Ratna Constructions, Hyderabad | Pulivendla Branch Canal Package 92A |
Kadapa dist., A.P. | Conducting contour surveying of the ayacut of about 22,150 acres and preparing ayacut registers, maps and detailed survey and investigation for new 7 tanks and improvement to the existing 7 tanks. | 130 | 22 150 | Work stopped temporarily by the client | Mar-08 | |
24 | Venkatramaiah Company, Hyderabad | Mid Manair Reservoir | Karimangar dist A.P. | Conducting survey, detailed investigation of right main canals system for an ayacut of 13,000 acres including preparing HPs, estimates of canals, design of structures, preparing LP Schedules, LS drawings etc., block leveling for an area of 18,000 acres to generate 1.0m contours. | 95 | 13 000 | Stopped | May-08 | May-11 |
25 | AKR Constructions, Hyderabad | J. Chokkarao Godavari Lift Irrigation Project. Canal distribution system. |
Warangal dist. AP | Survey, Investigation for the Proposed Right and Left Main Canals and its distributaries system including block leveling for 1.0m contours of an area of 85,000 acres, preparation of ayacut maps, registers, site surveys, LP Schedules, designing of structures, survey of field channels etc. pertaining to Tapaspally Reservoir for an aycut of 59,00 acres. | 320 | 59 000 | Re-started and in progress | Aug-08 | |
26 | HCC Limited | Pranahitha - Chevella Barrage across Pranahitha River | Adilabad dist | Conducting detail survey for the barrage across Pranahita river, taking LS, CS and grid survey, demarcating FRL contour (about 250 kms), conducting contour survey for ascertaining capacity of the barrage including taking grid levels in Wainganga and Wardha rivers in Maharashtra including Bathymetry survey and preparing Land Acquisition plans and schedules for the submergence area. | 4 | 20 000 | Re-started and in progress | Sep-08 | |
27 | Reddy Veeranna Constuction Pvt. Ltd. | Rehabilitation & Upgrading of Bemetra (Km. 67+390) to Mungeli (Km. 109+830) section. | Bilaspur, Chattisgarh | Preparation of Cross Section and Volume reports of the road | 23 | Completed | Feb-09 | Mar-09 | |
28 | M/s Rithwik Projects Limited | TBHLC [Package 1 & 6) |
Anantapur dist., A.P. | Conducting detail survey and investigation for the widening of the Tungabhadra High Level Canal from km 105.47 to 115.00 [package 1] and from km 172.000 to km 189.000 and submitting HPs, site survey of CM & CD works etc. | 27 | Completed | Jun-09 | Dec-09 | |
29 | Jaiprakash-Gayathri Joint Venture | Dummugudem-Nagarjunasagar Tail Pond Link Canal from Km. 182.00 to Km. 206.00 [Package-8] | Near Suryapet | Fixing alignment of the canal, strip surveys, taking L.S. and C.S., submitting HPs, LA proposals, conducting site surveys, DCBM surveys, fixing stones etc | 24 | Completed | Jun-09 | Feb-10 | |
30 | Saidax Engineers & Infrastructures Pvt. Ltd. | Kaleshwar Lift Irrigation Project | Kaleshwar, Karimnagar Dist, Andhra Pradesh | Conducting survey, detailed investigation of right main canals system for an ayacut of 45,000 acres including preparing HPs, estimates of canals, preparing LP Schedules, LS drawings etc., block leveling for an area of 60,000 acres to generate 1.0m contours. | 250 | 45 000 | Discontinued | Nov-09 | May-11 |
31 | Coastal Projects Pvt. Ltd. | Devadula Lift Irrigation Project. Phase 3- package-2, Tunnel from Bhimghanpur tank to Ramappa tank. |
Hanamkonda | Fixing entry and exit points, fixing alignment of tunnel, strip survey, carrying Bench Mark from GTS location, taking L.S. and C.S., fixing alignment on ground. Conducting geotechnical and geophysical investigation by digging bore-holes, ERM test and Designing of tunnel and taking approval from the CDO, Hyderabad. |
22 | Completed | Dec-09 | Nov-10 | |
32 | Coastal Projects Pvt. Ltd. | Devadula Lift Irrigation Project. Phase 3- package-3, Tunnel from Ramappa tank To Dharmasagar tank. |
Hanamkonda | Fixing entry and exit points, fixing alignment of tunnel, strip survey, carrying Bench Mark from GTS location, taking L.S. and C.S., fixing alignment on ground. Conducting geotechnical and geophysical investigation by digging bore-holes, ERM test and submission to client for designing and submission to competent authority for approval. |
55 | Completed | Jan-10 | Jan-11 | |
33 | M/s Dakshin Infrastructure Pvt. Ltd. Hyderabad | Hotel and Office complex | Hyderabad | Survey of the land boundary and marking of columns and layout of the proposed 22-storey building | Completed | Apr-10 | |||
34 | M/s Sujala Infrastructure Pvt. Ltd., Warangal, Andhra Pradesh | Devadula Lift Irrigation Project. Phase 3. |
Ghanpur (Station), Warangal district | Conducting survey, detailed investigation of 4L distributary of right main canal ofR.S. Ghanpur Tank for an ayacut of 24,000 acres including preparing HPs, estimates of canals including lining of canal upto 1.0 cumec discharge, preparing LP Schedules, design of CD & CM works, and preparing LS drawings etc., conducting block leveling for an area of 24,000 acres to generate 1.0m contours. | 150 | 24 000 | Completed | Nov-10 | Jul-13 |
35 | Bhooratnam Constructions & TA Infra Pvt. Ltd. | Choutpally -Hanmanth Reddy Canal | Nizamabad District, Andhra Pradesh | Conducting 1.0m contour survey, preparing BC map, ayacut registers, survey for field channels, taking LS & CS of the existing canal system etc. | 45 | 11 625 | Completed | Nov-10 | Apr-11 |
36 | V. Satyamurty Co, | JCR GLI, Phase3, Package-7 | Warangal dist. AP | Survey, investigation and design of structures, LP Schedules, HPs calculation etc. for an ayacut of 22,000 acres for L6 of the main canal from the new Nawabpet tank. | 100 | 22 000 | Completed | Dec-10 | Jul-12 |
37 | Mega Engineering & Infrastructure Limited | JCR GLI, Package 5 | Warangal dist. AP | Survey, investigation and design of structures, LP Schedules, HPs calculation etc. for an ayacut of 32,500 acres | 160 | 32 500 | In Progress | Jan-11 | |
38 | GKC Private Limited | Radhanpur Branch Canal, Gujarat | Radhanpur, Gujarat | Detail survey and investigation, design of structures for a canal system of 360 kilometers and 1500 structures | 360 | 75 000 | Completed | Apr-11 | Jan-13 |
39 | Kranti Constructions | JCR GLI, Package 6 | Warangal dist. AP | Survey, investigation and design of structures, LP Schedules, HPs calculation etc. for an ayacut of 78,000 acres | 450 | 78 000 | In Progress | Sep-11 | |
40 | Rithwik Projects Limited, Hyderabad | Construction of Kalma barrage across Mahanadi | Chattisgarh | Conducting contour survey in the Mahanadi river bed upto FRL +197.000 including Bathymetry survey for a length of about 20 Kms., marking FRL contour on the ground and submission of LP Schedule etc. | 8 000 | Completed | Dec-11 | Jul-12 | |
41 | Rithwik Projects Limited, Hyderabad | Construction of Basantapur barrage across Mahanadi | Chattisgarh | Conducting contour survey in the Mahanadi river bed upto FRL +211.910 including Bathymetry survey for a length of about 20 Kms., marking FRL contour on the ground and submission of LP Schedule etc. | 8 000 | Completed | Dec-11 | Jul-12 | |
42 | Sri Avantika Contractors Limited | Gurh Mauganj Lift Irrigation Scheme, Madhya Pradesh | Rewa District, MP | Survey, investigation and design of structures, LP Schedules, HPs calculation etc. for an ayacut of 38,000 acres | 180 | 38 000 | Stopped | Mar-12 | Apr-13 |
43 | Coramandel Infrastructure Limited | GNSS Package 2 | Kadapa dist., A.P. | Survey, investigation and design of structures, LP Schedules, HPs calculation etc. for an ayacut of 25,000 acres | 125 | 25 000 | In Progress | Oct-12 | |
44 | Rithwik Projects Limited, Hyderabad | Bansagar Feeder Canal from Km. 0.000 to Km. 68.000 in MP and UP | Rewa District, MP | Taking LS and CS of the existing Bansagar Feeder Canal from Bansagar dam for taking up the balance work on the canal | 68 | Completed | Dec-12 | Feb-13 | |
45 | Sadbhav Engineering Limited, Ahmedabad | HNSS Package-3 | Anantapur dist., A.P. | Survey, investigation and design of structures for an ayacut of 16,000 acres | 95 | 16 000 | In Progress | Feb-13 | |
46 | L&T | Cement Plant | Chittaurgarh, Rajasthan | Hiring of one Total Station team at the plant till the completion of construction of the plant | Completed | Mar-13 | |||
47 | Mega Engineering & Infrastructure Limited | Dummugudem-Nagarjunasagar Tail Pond Link Canal- Package 5 & 6 | Khammam dist. AP | Carrying detail survey and investigation for the proposed Tailpond Link Canal and submission of proposals. | 85 | Stopped | Jul-13 | ||
48 | Hindustan Engineers Syndicate | Pench Diversion Project | Chhindwara district, MP | Survey, investigation and design of structures, LP Schedules, HPs calculation etc. for an ayacut of 46,000 acres | 250 | 46 000 | In Progress | Aug-13 | |
49 | SEW Infra-RPL (JV) | Construcion of Kantalapally barrage across Godavari River | Warangal dist. AP | Details survey, investigation for the barrage alignment, taking LS and CS across Godavari River including Bathymetry survey, marking and stone fixing for the FRL and MWL contours and submission of LP Schedules and survey for the submerged R&B roads. | In Progress | Sep-13 | |||
50 | Navayuga Engineering Company Limited, Hyderabad | Komrambhim Project | Adilabad dist | Detail survey and investigation for development of the existing Kosini tank into a balancing reservoir & Conducting 1.0m contour survey, preparing ayacut maps and registers and surveying for the field channels for an ayacut of 26,000 acres | 26 000 | In Progress | Dec-13 | Site work completed | |
51 | Navayuga Engineering Company Limited, Hyderabad | Pranahita-Chevella Project, Package 21 | Nizamabad, Karimnagar districts | Ayacut survey and investigation of distributaries, minors and field channels of Padakanti - Metpally main canal. | 400 | 80 000 | In Progress | Dec-13 | |
51 | Irrigation & CAD Dept of Telanagana | SID of minor irrigation tanks in Medak district under RRR scheme funded by World Bank | Medak dist. AP | Conducting capacity survey, LS and CS of the earthen bund and canals, taking measurements of sluices and weir for repairs, preparation of DPRs and complete estimate for approval by CWC and the department. | 152 Nos. of tanks [30,000 approx. acres total ayacut] | 30 000 | In Progress | Feb-15 | |
52 | Contec Design & Engineering Pvt. Ltd. | Jalaput and Donkaraya reservoirs across Sileru river | Orissa & Telangana | Bathymetry and topographical survey in the reservoir on U/s and D/s for conducting studies to ascertain feasibility of power project. | 1 800 | In Progress | Nov-15 | ||
53 | Mega Engineering & Infrastructure Limited | Gandipally Reservoir | Karimangar dist. Telangana | Conducting survey, investigation and design of structures including fixing alignment of canal systems, preparing LS and survey plan, design of canals, 1.0m contour surveying, preparing LP Schedules and estimates etc. for an ayacut of 40,000 acres. | 260 | 40 000 | In Progress | Apr-16 | |
TOTAL | 5226 | 10 13 075 |