Sl. No. Name of the client Project name Location of the project Scope of the project Length of canal system/ road/ dam in kms Ayacut/ contour survey in acres Status  Work started Completion
1 AP government Irrigation and CAD Department Karlapally project Warangal dist. AP Survey and Investigation, estimate, design of the minor irrigation tank.    3 000 Completed Aug-04 Jan-05
2 AP government Irrigation and CAD Department Alguvagu Project Khammam dist. AP Survey and Investigation, estimate of the minor irrigation tank.    2 000 Completed Sep-04 Jan-05
3 M/s Jaiprakash-Gayatri [JV] SRSP - FFC Koratla, Karimnagar district FFC from Km. 43.000 to Km. 57.000. Taking L.S. and C.S. , preparing LA proposals, DCBM, preparing estimates, fixing stones etc. 14   Completed Nov-04 Apr-05
4 M/s Ratna Constructions & Hindustan Engineers Syndicate Joint Venture, Hyderabad Polavaram Project across Godavari river West Godavari dist, A.P. Detail survey and investigation for two connectivities, two regulators and furnishing relevant drawings.     Completed Mar-05 Jun-05
5 AP R&B Department R&B road survey Medak dist. AP L.S. and C.S. survey of the road for preparing estimates 4   Completed Apr-05 Jun-05
6 K. Sudarshan Reddy & M/s K. Venkateshwarlu JV, Warangal A.P. J. Chokkarao Godavari Lift Irrigation Project.
Canal distribution system.
[Packages 45 & 46]
Warangal dist. AP Detailed survey of more than 500 kilometers of canals system, block leveling for 1.0M contour survey for an ayacut of 1,23,000 acres, and preparation of all drawings, reports, land acquisition proposals, estimates and ayacut maps etc. to be submitted to the government. 600 1 23 000 Completed Apr-05 Apr-08
7 M/s Ramky Infrastructure & V. Satyamurty JV, Warangal, A.P. Sreeramasagar Project - Stage2 canal system Nalgonda dist A.P.  Detailed Investigation and surveys of distributaries of 36L of DBM71 of Kakatiya Main Canal, [ 50 kilometers of canals, preparation of all drawings, reports, LP Schedules, estimates and ayacut maps, surveys for Field channels etc.  80  38 000 Completed May-05 Jun-06
8 AP government Irrigation and CAD Department Dharmasagar  project under the Devadula Project. Warangal dist. AP Survey and Investigation of medium irrigation tank for restoration. 30   Completed Oct-05 Jan-05
9 M/s Coastal Projects & AKR JV, Hyderabad  Nettempadu Lift Irrigation Project,
Canal distribution system
Mahbubnagar dist. A.P.  Conducting survey, detailed investigation of left and right main canals system of about 200 km under Gudemdoddi Balancing reservoir for irrigating an ayacut of about 27,000 acres ID Kharif including distributary network system and 1.0m contour survey for an area of about 40,000 acres. 150  27 000 Stopped Dec-05 Oct-06
10 AP Industrial  Infrastructure Corporation, Warangal Industries survey Khammam dist. AP Land survey of the land for their development located in Khammam district. The survey was meant to generate contours of 1.0m interval and obtaining all the topographical details in the land and determination of the boundary of the land and preparing relevant drawings.     Completed Jan-06 Mar-06
11 Subhash Projects & Marketing Limited, Kothagudem, Karimnagar District. Yellampally Barrage Project across Godavari River Karimangar dist A.P.  Preparing Land Procurement schedules and village-wise maps for the proposed alignment for laying pipeline from the Yellampally barrage to the NTPC, Kothagudem     Completed Feb-06 Mar-06
12 M/s Sushee Hitech Pvt. Ltd. Hyderabad  Mid Manair Reservoir  Karimangar dist A.P.  Detailed survey to compute capacity  [27 TMC] of the Reservoir, and demarcation of FRL contour [92 kilometers] and survey for the alignment of the proposed dam, site survey for the gated-operational spillway and preparing drawings, Land Procurement Schedules etc. and contour survey to compute capacity of the reservoir for an area of 20,000 acres. 10  20 000 Completed Mar-06 Sep-06
13 Rithwik Projects Limited, Hyderabad Mylawaram Reservoir South Canal Kadapa dist., A.P.  Detailed survey of the existing canal system of 25,000 acres under the Mylawaram reservoir, for its modernization. This work comprises taking cross-sections and longitudinal sections of the existing canals, designingof HPs of the canals, proposing lining to the canals and preparing estimates etc. 190  25 000 Completed Apr-06 Nov-07
14 [A score of big construction companies] DGPS Projects A.P., Tamilnadu, Karnataka, Bihar, Himachal Pradesh, Goa Establishing network of control points with DGPS operated by a highly experienced team of operators and technicians along oil pipelines alignments, four-laning of national highways in Andhra Pradesh, Karnataka and Tamil Nadu, skiing projects in Manali, Resorts in Goa etc.       Jun-06  
15 M/s Sushee Hitech Pvt. Ltd., Hyderabad Srisailam Right Branch Canal
[Package 25)
Kurnool dist. A.P.  Survey and Investigation of SRBC from km 0.000 to km 25.067 for the proposed widening from the present 6.10m to 40.0m of bed width including site surveys, submission of HPs, LP schedules etc. 25   Completed Nov-06 Mar-07
16 M/s Coastal Projects Pvt. Ltd., Hyderabad HNSS Proejct
[Packages 6,10,15 & 20]
Anantapur dist., A.P. Survey, Investigation, designs of the proposed  4 tunnels under packages 6, 10, 15 and 20 of the HNSS main canal. [total length of tunnels = 14 kms] 15   Completed Jan-07 Mar-07
17 Ratna Constructions, Hyderabad  Flood Flow Canal, G.N.S.S. Proejct Kurnool dist. A.P.  Survey, investigation, preparation of HPs of the proposed Flood Flow Canal from km 46.000 to km 57.700 of the Srisailam and submission of proposals to the CE, CDO, Hyderabad for approval and LP Schedules. [ Package 29 ] 12   Completed Mar-07 Aug-07
18 PJR Constructions Rajiv Sagar Project [Dummugudem Project]
Package 68/2
Khammam dist. AP Conducting survey of the proposed approach canals fromt the Godavari river and link canals upto Karakavagu including fixing alignments of the canals, preparing LP Schedules, conducting site survey for the structures etc and submitting propossals to the govt. for approval. 45   Completed May-07 Apr-08
19 M/s V. Satyamurty Company J. Chokkarao Godavari Lift Irrigation Project.
Canal distribution system.
Warangal dist. AP Survey, Investigation for the Proposed Right Main Canal and its distributaries system including block leveling for 1.0m contours of an area of 65,000 acres, preparation of ayacut maps, registers, site surveys, LP Schedules etc. pertaining to Ghanpur Reservoir for an ayacut of 40,000 acres 150  40 000 Completed Sep-07 Jun-08
20 Ratna Constructions, Hyderabad  Rajiv Sagar Project [Dummugudem Project] Khammam dist. AP Survey, investigation, preparation of L.S. and Survey Plans, preparation of LP Schedules, fixing of BM and boundary stones etc, submission of the proposals for the proposed pressure mains for approval to the CE, CDO, Hyderabad under Package 33. The length of the pipeline is around 35 kilometers in two rows of pipes. 33   Completed Sep-07 Mar-08
21 M/s Coastal Projects Limited Flood Banks along Godavari River
Packages 70.71,72,73
Khammam dist. AP Conducting survey to construct flood banks along the banks of the Godavari river near Bhadrachalam town and other villages in the vicinity, the work includes conducting contour survey to finalize alignment of the flood banks for about 70 kms , preparing LP Schedules, preparing estimates etc for taking approval from the government. 70   Completed Nov-07 Mar-08
22 M/s Ratna -MEIL JV,
Hyderabad
Gandipally Reservoir Husnabad, Karimnagar dist. Conducting detail survey and investigation of the proposed reservoir at Gandipally village near Husnabad, Karimnagar district including survey of left and right main canals, distribution system of canals and block leveling for an ayacut of 14,000 acres. 120  14 000 Discontinued Jan-08 Dec-08
23 Ratna Constructions, Hyderabad  Pulivendla Branch Canal
Package 92A
Kadapa dist., A.P.  Conducting contour surveying of the ayacut of about 22,150 acres and preparing ayacut registers, maps and detailed survey and investigation for new 7 tanks and improvement to the existing 7 tanks. 130  22 150 Work stopped temporarily by the client Mar-08  
24 Venkatramaiah Company, Hyderabad Mid Manair Reservoir  Karimangar dist A.P.  Conducting survey, detailed investigation of right main canals system for an ayacut of 13,000 acres including preparing HPs, estimates of canals, design of structures,  preparing LP Schedules, LS drawings etc., block leveling for an area of 18,000 acres to generate 1.0m contours. 95  13 000 Stopped May-08 May-11
25 AKR Constructions, Hyderabad  J. Chokkarao Godavari Lift Irrigation Project.
Canal distribution system.
Warangal dist. AP Survey, Investigation for the Proposed Right and Left Main Canals and its distributaries system including block leveling for 1.0m contours of an area of 85,000 acres, preparation of ayacut maps, registers, site surveys, LP Schedules, designing of structures, survey of field channels etc. pertaining to Tapaspally Reservoir for an aycut of 59,00 acres. 320  59 000 Re-started and in progress Aug-08  
26 HCC Limited Pranahitha - Chevella Barrage across Pranahitha River Adilabad dist Conducting detail survey for the barrage across Pranahita river, taking LS, CS and grid survey, demarcating FRL contour (about 250 kms), conducting contour survey for ascertaining capacity of the barrage including taking grid levels in Wainganga and Wardha rivers in Maharashtra including Bathymetry survey and preparing Land Acquisition plans and schedules for the submergence area. 4  20 000 Re-started and in progress Sep-08  
27 Reddy Veeranna Constuction Pvt. Ltd. Rehabilitation & Upgrading of Bemetra (Km. 67+390) to Mungeli (Km. 109+830) section. Bilaspur, Chattisgarh Preparation of Cross Section and Volume reports of the road 23   Completed Feb-09 Mar-09
28 M/s Rithwik Projects Limited TBHLC
[Package 1 & 6)
Anantapur dist., A.P. Conducting detail survey and investigation for the widening of the Tungabhadra High Level Canal from km 105.47 to 115.00 [package 1] and from km 172.000 to km 189.000 and submitting HPs, site survey of CM & CD works etc. 27   Completed Jun-09 Dec-09
29 Jaiprakash-Gayathri Joint Venture Dummugudem-Nagarjunasagar Tail Pond Link Canal from Km. 182.00 to Km. 206.00 [Package-8] Near Suryapet Fixing alignment of the canal, strip surveys, taking L.S. and C.S., submitting HPs, LA proposals, conducting site surveys, DCBM surveys, fixing stones etc 24   Completed Jun-09 Feb-10
30 Saidax Engineers & Infrastructures Pvt. Ltd. Kaleshwar Lift Irrigation Project Kaleshwar, Karimnagar Dist, Andhra Pradesh Conducting survey, detailed investigation of right main canals system for an ayacut of 45,000 acres including preparing HPs, estimates of canals, preparing LP Schedules, LS drawings etc., block leveling for an area of 60,000 acres to generate 1.0m contours. 250  45 000 Discontinued Nov-09 May-11
31 Coastal Projects Pvt. Ltd. Devadula Lift Irrigation Project.
Phase 3-
package-2, Tunnel from Bhimghanpur tank to Ramappa tank.
Hanamkonda Fixing entry and exit points, fixing alignment of tunnel, strip survey, carrying Bench Mark from GTS location, taking L.S. and C.S., fixing alignment on ground.
Conducting geotechnical and geophysical investigation by digging bore-holes, ERM test and Designing of tunnel and taking approval from the CDO, Hyderabad.
22   Completed Dec-09 Nov-10
32 Coastal Projects Pvt. Ltd. Devadula Lift Irrigation Project.
Phase 3-
package-3, Tunnel from  Ramappa tank To Dharmasagar  tank.
Hanamkonda Fixing entry and exit points, fixing alignment of tunnel, strip survey, carrying Bench Mark from GTS location, taking L.S. and C.S., fixing alignment on ground.
Conducting geotechnical and geophysical investigation by digging bore-holes, ERM test and submission to client for designing and submission to competent authority for approval.
55   Completed Jan-10 Jan-11
33 M/s Dakshin Infrastructure Pvt. Ltd. Hyderabad  Hotel and Office complex Hyderabad  Survey of the land boundary and marking of columns and layout of the proposed 22-storey building     Completed Apr-10  
34 M/s Sujala Infrastructure Pvt. Ltd., Warangal, Andhra Pradesh Devadula Lift Irrigation Project.
Phase 3.
Ghanpur (Station), Warangal district Conducting survey, detailed investigation of 4L distributary of right main canal ofR.S. Ghanpur Tank for an ayacut of 24,000 acres including preparing HPs, estimates of canals including lining of canal upto 1.0 cumec discharge, preparing LP Schedules, design of CD & CM works, and preparing LS drawings etc., conducting block leveling for an area of 24,000 acres to generate 1.0m contours. 150  24 000 Completed Nov-10 Jul-13
35 Bhooratnam Constructions & TA Infra Pvt. Ltd. Choutpally -Hanmanth Reddy Canal Nizamabad District, Andhra Pradesh Conducting 1.0m contour survey, preparing BC map, ayacut registers, survey for field channels, taking LS & CS of the existing canal system etc. 45  11 625 Completed Nov-10 Apr-11
36 V. Satyamurty Co, JCR GLI, Phase3, Package-7 Warangal dist. AP Survey, investigation and design of structures, LP Schedules, HPs calculation etc.  for an ayacut of 22,000 acres for L6 of the main canal from the new Nawabpet tank. 100  22 000 Completed Dec-10 Jul-12
37 Mega Engineering & Infrastructure Limited JCR GLI, Package 5 Warangal dist. AP Survey, investigation and design of structures, LP Schedules, HPs calculation etc.  for an ayacut of 32,500 acres 160  32 500 In Progress Jan-11  
38 GKC Private Limited Radhanpur Branch Canal, Gujarat Radhanpur, Gujarat Detail survey and investigation, design of structures for a canal system of 360 kilometers and 1500 structures 360  75 000 Completed Apr-11 Jan-13
39 Kranti Constructions JCR GLI, Package 6 Warangal dist. AP Survey, investigation and design of structures, LP Schedules, HPs calculation etc.  for an ayacut of 78,000 acres 450  78 000 In Progress Sep-11  
40 Rithwik Projects Limited, Hyderabad Construction of Kalma barrage across Mahanadi Chattisgarh Conducting contour survey in the Mahanadi river bed upto FRL +197.000 including Bathymetry survey for a length of about 20 Kms., marking FRL contour on the ground and submission of LP Schedule etc.    8 000 Completed Dec-11 Jul-12
41 Rithwik Projects Limited, Hyderabad Construction of Basantapur barrage across Mahanadi Chattisgarh Conducting contour survey in the Mahanadi river bed upto FRL +211.910 including Bathymetry survey for a length of about 20 Kms., marking FRL contour on the ground and submission of LP Schedule etc.    8 000 Completed Dec-11 Jul-12
42 Sri Avantika Contractors Limited Gurh Mauganj Lift Irrigation Scheme, Madhya Pradesh Rewa District, MP Survey, investigation and design of structures, LP Schedules, HPs calculation etc.  for an ayacut of 38,000 acres 180  38 000 Stopped Mar-12 Apr-13
43 Coramandel Infrastructure Limited GNSS Package 2 Kadapa dist., A.P.  Survey, investigation and design of structures, LP Schedules, HPs calculation etc.  for an ayacut of 25,000 acres 125  25 000 In Progress Oct-12  
44 Rithwik Projects Limited, Hyderabad Bansagar Feeder Canal from Km. 0.000 to Km. 68.000 in MP and UP Rewa District, MP Taking LS and CS of the existing Bansagar Feeder Canal from Bansagar dam for taking up the balance work on the canal 68   Completed Dec-12 Feb-13
45 Sadbhav Engineering Limited, Ahmedabad HNSS Package-3 Anantapur dist., A.P. Survey, investigation and design of structures for an ayacut of 16,000 acres 95  16 000 In Progress Feb-13  
46 L&T Cement Plant Chittaurgarh, Rajasthan Hiring of one Total Station team at the plant till the completion of construction of the plant     Completed Mar-13  
47 Mega Engineering & Infrastructure Limited Dummugudem-Nagarjunasagar Tail Pond Link Canal- Package 5 & 6 Khammam dist. AP Carrying detail survey and investigation for the proposed Tailpond Link Canal and submission of proposals. 85   Stopped Jul-13  
48 Hindustan Engineers Syndicate Pench Diversion Project Chhindwara district, MP Survey, investigation and design of structures, LP Schedules, HPs calculation etc.  for an ayacut of 46,000 acres 250  46 000 In Progress Aug-13  
49 SEW Infra-RPL (JV) Construcion of Kantalapally barrage across Godavari River Warangal dist. AP Details survey, investigation for the barrage alignment, taking LS and CS across Godavari River including Bathymetry survey, marking and stone fixing for the FRL and MWL contours and submission of LP Schedules and survey for the submerged R&B roads.     In Progress Sep-13  
50 Navayuga Engineering Company Limited, Hyderabad Komrambhim Project Adilabad dist Detail survey and investigation for development of the existing Kosini tank into a balancing reservoir & Conducting 1.0m contour survey, preparing ayacut maps and registers and surveying for the field channels for an ayacut of 26,000 acres    26 000 In Progress Dec-13 Site work completed
51 Navayuga Engineering Company Limited, Hyderabad Pranahita-Chevella Project, Package 21 Nizamabad, Karimnagar districts Ayacut survey and investigation of distributaries, minors and field channels of Padakanti - Metpally main canal. 400  80 000 In Progress Dec-13  
51 Irrigation & CAD Dept of Telanagana SID of minor irrigation tanks in Medak district under RRR scheme funded by World Bank Medak dist. AP Conducting capacity survey, LS and CS of the earthen bund and canals, taking measurements of sluices and weir for repairs, preparation of DPRs and complete estimate for approval by CWC and the department. 152 Nos. of tanks [30,000 approx. acres total ayacut]  30 000 In Progress Feb-15  
52 Contec Design & Engineering Pvt. Ltd. Jalaput and Donkaraya reservoirs across Sileru river Orissa & Telangana Bathymetry and topographical survey in the reservoir on U/s and D/s for conducting studies to ascertain feasibility of power project.    1 800 In Progress Nov-15  
53 Mega Engineering & Infrastructure Limited Gandipally Reservoir Karimangar dist. Telangana Conducting survey, investigation and design of structures including fixing alignment of canal systems, preparing LS and survey plan, design of canals, 1.0m contour surveying, preparing LP Schedules and estimates etc. for an ayacut of 40,000 acres. 260  40 000 In Progress Apr-16  
  TOTAL       5226 10 13 075